Transparent Pricing
Concrete Pricing
We explain every factor that changes the price — so you can evaluate any estimate, from us or anyone else. See also: full cost guide, concrete vs. pavers, FAQ.
Typical price ranges by project type
Concrete Driveway (replacement)
Concrete Patio (plain finish)
Concrete Patio (stamped)
Sidewalk / Walkway
Utility Slab / Shed Pad
Garage Floor (repair/resurface)
Concrete Repair (section)
Concrete Removal + Replacement
Decorative / Color Work
What increases project cost
Demolition and haul-off
Removing existing concrete adds equipment, labor, and disposal costs.
Site access constraints
Tight gates, narrow side yards, mature trees, and parking constraints slow down material delivery.
Base preparation
If the sub-base is soft, contaminated, or grades poorly, it needs regrading or compaction before the pour.
Drainage requirements
Flat Bay Area lots often require careful slope planning, drainage channels, or landscape tie-ins.
Concrete thickness
A 4-inch slab costs less per square foot than a 6-inch slab. Thickness is driven by load requirements.
Rebar and reinforcement
Wire mesh, rebar, or fiber additives add material cost but improve longevity.
Finish type
Broom finish is the baseline. Salt finish, exposed aggregate, and stamped concrete add labor and materials.
Color and stamp work
Integral color, release agents, and staining add cost proportional to complexity.
What reduces project cost
Clear, easy access
Wide gates, staging space, and unobstructed truck access reduce time and equipment requirements.
Bundled work
Combining driveway + apron + sidewalk replacement spreads mobilization costs.
Homeowner photos provided upfront
Good photos before the visit help scope accurately.
Simple broom finish
A standard broom finish is the most cost-efficient finish.
No demolition required
New concrete on bare ground avoids demo and haul-off costs.
When concrete work may not be the right move yet
Cosmetic patch over a drainage or base problem
If water is pooling, settling is happening, or the sub-base has failed, patching the surface will not solve the underlying issue.
Same-day use after a pour
Concrete needs 24-48 hours of foot-traffic cure time minimum, and 7-10 days before most vehicle use.
Unresolved site conditions
Tree root conflicts, drainage from adjacent properties, or ongoing utility work should be resolved before concrete is placed.