Mountain View, CA · Silicon Valley Peninsula
What to Expect

How a Henry Concrete project works from first contact to finished slab

01

Request and Initial Review

You submit a project request — ideally with photos of the site, the address, and a description of the problem or project goal. Henry Concrete reviews the details and reaches out if more information is needed.

02

On-Site Scope Conversation

A site visit is needed to scope accurately. Access constraints, existing concrete condition, drainage slope, base condition, and finish requirements are assessed in person.

03

Written Estimate

You receive a written estimate that covers scope, materials, schedule, and what could change the price if conditions discovered after demo differ from expectations.

04

Site Preparation

Prep may include demolition and haul-off, sub-base grading or compaction, drainage planning, form setting, and rebar or wire mesh placement.

05

Pour Day

Concrete is ordered to specification and poured. Finishing — float, broom, stamp, or other surface treatment — happens the same day as the pour.

06

Cure Time and Access

Foot traffic is typically safe after 24-48 hours. Vehicle access requires 7 days minimum, with full cure strength reached around 28 days.

Process questions

Get Started

Ready to start the process?

Submitting a request is step one. No commitment, no pressure — just a scope conversation and a written estimate.